Shrinking machine installation and precautions

- Apr 09, 2019-

The shrinking machine is a large-scale equipment, which is highly praised and trusted by customers. Its application range is also quite wide. The general products can be packaged, but before using the heat shrink packaging machine, it needs to be installed and needs attention. The problem is also more, below, Xiaobian will explain the installation needs to pay attention to it.

The eight major things to note when installing a shrinking machine:

1. The shrinking machine consumes a lot of power, so the input power must be greater than the nominal power on the shrinking machine nameplate, otherwise it is easy to burn the line or electrical components;

2, must be reliably grounded to protect personal safety;

3. Each machine is shipped with a cable connected to the power supply. The terminal lead part has the identification symbol of the power supply and must be connected correctly. Violation of the regulations may result in electric shock.

4. When the specified voltage of the machine is three-phase 380V power supply, the zero line must be input at the same time, that is, the standard three-phase four-wire system, otherwise the machine can not work normally, and it is easy to burn internal electrical components;

5, the machine must be installed horizontally, otherwise it will shorten the service life of the electric heating tube. For machines that carry belts, their tilting installation will cause the conveyor belt to be off center;

6. When the machine is used continuously for more than three months, the temperature-resistant wires of the shrinkage chamber should be inspected and replaced according to the degree of aging;

7. When the machine is working, the operator's palm and other parts are not allowed to contact with the running part of the machine, especially the temperature inside the shrinking chamber is high, and it is easy to burn;

8. After the packaging work is finished, the heating switch should be turned off first, so that the conveying motor and the fan motor continue to run for about 10 minutes, and then the entire power supply is cut off.

To achieve the above eight major considerations, we can better use the shrinking machine, so that we can improve our production efficiency, otherwise it will be a very bad thing.